Autoplay
Autocomplete
Previous Lesson
Complete and Continue
ROAD CONSTRUCTION METHODS AND TECHNIQUES
1.0 Introduction to the Course
1.1 Welcome Remarks (27:04)
2.0 Basic Surveys and Investigation
2.1 Fundamentals of Subsurface Exploration (71:01)
2.2 Basic Geotechnical Engineering (27:08)
2.3 Engineering Surveys 1 (25:00)
2.4 Engineering Surveys 2 (28:55)
3.2 Cross Drainage/Culvert as Drainage Structures (w/ permission and paid promotions) (10:19)
3.0 Road Drainage
3.1 Introduction to Drainage (55:56)
4.0 Road Construction Methods
4.0 Introduction to Highway Engineering (w/ permission and paid promotions) (21:00)
4.1 Introduction to Roads and Highways (36:46)
4.2 Preliminary Activities (26:50)
4.3 Road Base Preparation (19:11)
4.4 Formation of Subgrade (47:04)
4.5 Stabilizing Layers (15:21)
4.6 Construction of PCCP - 1 (32:27)
4.7 Construction of PCCP - 2 (38:17)
4.8 Construction of PCCP - 3 (19:53)
4.9 Construction of Asphalt Concrete Pavement (42:27)
4.10 Drainage Structures (29:44)
4.11 Road Slope Protection Structures (50:28)
4.12 Miscellaneous Works, Structures (51:01)
5.0 CASE STUDY
5.1 Case Study for the Course
5.2 Final Examination (W/ Reference to the Case Study)
6.0 Review of the Course
6.1 Review of the Course
6.2 Important Notes of the Course
2.3 Engineering Surveys 1
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock