Autoplay
Autocomplete
Previous Lesson
Complete and Continue
ROAD CONSTRUCTION METHODS AND TECHNIQUES
1.0 Introduction to the Course
1.1 Welcome Remarks (27:04)
2.0 Basic Surveys and Investigation
2.1 Fundamentals of Subsurface Exploration (71:01)
2.2 Basic Geotechnical Engineering (27:08)
2.3 Engineering Surveys 1 (25:00)
2.4 Engineering Surveys 2 (28:55)
3.2 Cross Drainage/Culvert as Drainage Structures (w/ permission and paid promotions) (10:19)
3.0 Road Drainage
3.1 Introduction to Drainage (55:56)
4.0 Road Construction Methods
4.0 Introduction to Highway Engineering (w/ permission and paid promotions) (21:00)
4.1 Introduction to Roads and Highways (36:46)
4.2 Preliminary Activities (26:50)
4.3 Road Base Preparation (19:11)
4.4 Formation of Subgrade (47:04)
4.5 Stabilizing Layers (15:21)
4.6 Construction of PCCP - 1 (32:27)
4.7 Construction of PCCP - 2 (38:17)
4.8 Construction of PCCP - 3 (19:53)
4.9 Construction of Asphalt Concrete Pavement (42:27)
4.10 Drainage Structures (29:44)
4.11 Road Slope Protection Structures (50:28)
4.12 Miscellaneous Works, Structures (51:01)
5.0 CASE STUDY
5.1 Case Study for the Course
5.2 Final Examination (W/ Reference to the Case Study)
6.0 Review of the Course
6.1 Review of the Course
6.2 Important Notes of the Course
4.12 Miscellaneous Works, Structures
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock